References

strailpedeGluecksburger Strasse level crossing

A safe level crossing for all road users


  • Location: Glücksburger Straße, Ibbenbüren (Germany)
  • Period: Summer 2024
  • Client: Infratek Baumanagement GmbH

Following an urgent refurbishment in Ibbenbüren, the Glücksburger Straße level crossing now ensures maximum safety for everyone thanks to the new track alignment.

STRAILwaySTRAILway bridge sleepers France

Ecological excellence: STRAILway secures the “Pont Bleu” over the Drôme


  • Location: Aspres-sur-Buëch, France
  • Period: April 2021
  • Client: SNCF RESEAU

As part of the €70 million refurbishment of the Livron–Aspres line, SNCF Réseau faced an environmental challenge: the ‘Pont Bleu’ spans a strictly protected nature reserve. The solution for maximum water protection and technical precision were STRAILway polymer sleepers.

STRAILwaySTRAILway polymer sleepers bridge sleepers installation Hungary

Follow-up project in Hungary: GYSEV once again relies on STRAILway for bridge refurbishment


  • Location: Railway line no. 16, Hegyeshalom, Szombathely, Hungary
  • Period: May 2023
  • Client: GYSEV ZRt.

Building on their successful experience since 2020, Hungary’s GYSEV ZRt. once again turned to STRAILway for the refurbishment of the Répcelak tidal channel bridge. In May 2023, aging wooden bridge sleepers were replaced with the durable, modern polymer solution.

STRAILwaySTRAILway Salzgitter turnout sleepers in the steelworks

STRAILway replaces wooden sleepers in steelworks


  • Location: Salzgitter steelworks, Germany
  • Period: May 2018
  • Client: Verkehrsbetriebe Peine-Salzgitter GmbH

Extreme loads of 15 million gross tons per year and maintenance-intensive wooden sleepers posed major challenges for the plant railway at Salzgitter Flachstahl GmbH. The solution: the all-inclusive, worry-free STRAILway polymer sleeper package – in service since 2018 and still in outstanding condition.

STRAILway 30STRAILway 30 Bolzano

STRAILway 30: Easy installation saves time in South Tyrol


  • Location: Renon, Bolzano (Italy)
  • Period: May 2025
  • Client: STA, DE ALOE

In South Tyrol, a section of track in Renon was modernized. The project relied on inno for safe level crossings and the innovative STRAILway 30 sleepers for efficient on-site installation.

mSW 360mSW 360 Ammertal

Our mini noise barrier: Effective and unobtrusive


  • Location: Gültstein and Unterjesingen in Tübingen-Herrenberg (Ammertal)
  • Period: October to November 2022
  • Client: Ammertal public transport association (Zweckverband ÖPNV)

The reactivation of the Ammertalbahn presented the operator with the challenge of effectively protecting residents in densely populated areas from rail noise—without impacting the surrounding landscape. Discover how the compact and flexible design of the mSW 360 delivered the ideal, discreet solution thanks to its low installation height and technical versatility.

Green trackGreen track Munich

STRAILastic green track: Fast setup, flawless insulation


  • Location: Munich
  • Period: August 2023
  • Client: Stadtwerke München GmbH

During the refurbishment of Munich’s Tram Line 25, Stadtwerke München installed 1,880 meters of green track. Discover how the STRAILastic_R profile not only met the stringent requirements for stray current insulation, but also, thanks to its quick and easy installation, helped the project reach completion ahead of schedule.

innoWater Tower Bridge with tram

inno: Emergency access and derailment protection on Water Tower Bridge


  • Location: Water Tower Bridge, Luxembourg
  • Period: April – May 2024
  • Client: Frateur

On the busy Water Tower Bridge in Luxembourg City, the combination of car and tram traffic poses a particular challgenge. Find out how the inno level crossing panels enable emergency access thanks to custom cutting and the integration of a derailment protection groove, while at the same time guaranteeing maximum safety in the event of a tram derailment.

velovelo Preston finished level crossing

72 meters of safety: velo ensures barrier-free crossings for cyclists


  • Location: Preston, North West England (UK)
  • Period: March 2022
  • Client: Ribble Rail

The deteriorated level crossing on Strand Road in Preston posed a safety risk—especially for the many cyclists. Discover how Ribble Rail used the velo system to make the crossing both safe and barrier-free, and how the 72-meter-long crossing was completed in just five hours thanks to the system’s rapid installation.

GRSSOK_simplexTrack damping system Ulm4

Complex track refurbishment with the STRAILastic track damping system


  • Place: Ulm, Germany
  • Period: August 2024
  • Client: SWU Verkehr GmbH

A successful track refurbishment in Ulm: Our STRAILastic_SOK_simplex was seamlessly installed despite an 8 % descending gradient, a curve, and an underpass. A testament to maximum flexibility and performance under the toughest conditions.

pedepede Tunnel Milan

Flame-retardant pede solution for metro tunnels


  • Location: Milan (Italy)
  • Period: 2022
  • Client: Metropolitana di Milano /A.T.M. Spa, G.C.F. Spa

Across the Milan Metro network, 24 pede level crossings with a flame-retardant rubber surface have been installed. These specially engineered crossings serve as essential emergency evacuation routes for passengers, significantly enhancing overall safety. Find out how our solution not only improves safety but also simplifies track maintenance.

pontistrailponti Romania 2

Efficient modernization with ponti and strail for critical crossings


  • Location: Tecuci North, Faurei-Tecuci (Romania)
  • Period: August 2023
  • Client: BAWI Construction SRL

Two level crossings in direct succession on the busy national road in Tecuci, Romania, represented a critical traffic junction. Find out how we installed a durable and modern solution in collaboration with track renewal. Despite challenging local conditions, the installation was completed in just two days.

gridgrid ulzburg

Keeping tracks safe: grid at Ulzburg Süd Station


  • Location: Ulzburg Süd station, Germany
  • Period: May 2024
  • Client: AKN Eisenbahn GmbH, Kaltenkirchen

Effective protection against unauthorized access to the track area: At the busy Ulzburg Süd station in Schleswig-Holstein, it only took 3.5 hours to install grid over a 30 m² area. The rubber panels enhance safety and convinced AKN Eisenbahn GmbH of its effectiveness.

IPIP Bonassola 2

Concrete-look noise protection blending seamlessly into the picturesque Cinque Terre coastline


  • Location: Cinque Terre, Bonassola
  • Period: March 2022
  • Client: Ferrovie dello Stato Italiane

Along the double-track coastal line in Bonassola (Cinque Terre), the rail operator was seeking a compact and visually appealing noise protection solution for the bridge sections. Thanks to the quick installation of the infill panels and their customized concrete-look design, rail noise was effectively reduced while the panels blend perfectly into the historic coastal landscape.

Rail web damperIPmSW 360STRAILwave noise protection solutions perfectly combined

Complete noise protection solution with the combined STRAILwave product range for reactivated tracks


  • Place: Nordhorn (Germany)
  • Period: 2019
  • Client: Bentheimer Eisenbahn AG

After 45 years of closure, Nordhorn was reconnected to passenger transport. In order to protect local residents and recreational areas along the reactivated line, Bentheimer Eisenbahn AG opted for a combination of three STRAILwave noise protection products: rail web dampers, IP and the mSW 360 mini noise barrier. Planning, organization and installation were successfully completed in just a few weeks.

STRAILwayTurnout with STRAILway polymer sleepers in Loucna

Polymer sleepers in Loucna stand out for their easy handling


  • Place: Loucna nad Desnou (Czech Republic)
  • Period: September 2023
  • Client: SART stavby a rekonstrukce a.s.

The first installation of STRAILway polymer sleepers in the Czech Republic took place in Loucna. This project involved replacing old wooden turnout sleepers. The quick, uncomplicated installation of the polymer sleepers and their attractive, high-quality design impressed the client and the railroad and public utility managers involved.

STRAIL D kerbstoneSTRAIL D kerbstone

Efficient drainage with the STRAIL D kerbstone


  • Location: Nuth station (Netherlands)
  • Period: August 2021
  • Client: Bouwplaats de Wilde Spoorbouw

In the rain-prone province of Limburg (Netherlands), the combination of the pede level crossing system and the STRAIL drainage kerbstone ensures efficient drainage and improved accessibility at the station.

edgePlatform edge for safe boarding and alighting

edge bridges the gap between the tram and the platform in Florence


  • Location: Florence, Italy
  • Products: edge
  • Length/quantity: 2x 42 m per station, 15 stations

To ensure optimal safety and comfort for passengers at the 15 stops of Florence’s Tram Line 1, the gaps between the platforms and the trams needed to be closed. KRAIBURG STRAIL’s flexible and durable edge system provided the perfect solution: it acts as a sturdy cushion while bridging the gap, significantly enhancing boarding safety.

pedepedeSOLARpedeSOLAR for safe level crossings even in the dark

pedeSOLAR creates bright, intuitive guidance for pedestrians at level crossings


  • Location: Kaltenkirchen, Germany
  • Period: May 2021
  • Client: AKN Eisenbahn GmbH

The innovative and sustainable pedeSOLAR system provides a self-sufficient, solar-powered lighting solution. It offers clear, additional guidance for cyclists and pedestrians, particularly in the area near a school in Kaltenkirchen Süd (Germany). The use of solar energy minimizes the risk of accidents in the dark and increases road safety in a sustainable and environmentally friendly way.

STRAIL B kerbstoneQuick installation of a level crossing with B kerbstone without precast foundations and with inno

Level crossing with inno and B kerbstone installed in just three hours


  • Location: Sachsel – Giswil, Switzerland
  • Period: March 2020
  • Client: Zentralbahn ZB

The increasingly tight track possession times in modern track construction require solutions that are not only robust, but above all quick to install. For this project, the choice fell on the efficient combination of the inno system, which is independent of sleeper spacing, and the B kerbstone, which requires no foundation. It took a team of four just three hours to install the entire 5.4-meter-long level crossing. Thanks to the B kerbstone’s foundation-free design, the track could be reopened to traffic immediately after installation.

profilProfil crane rail in Antwerp: ensuring safe crossings for logistics traffic

Smooth crossing: profil closes crane rail gaps at the Port of Antwerp


  • Location: Terminal DP World Antwerp, Belgium
  • Period: October 2021
  • Client: SIEBENS SPOORBOUW BV, Hemiksem

Massive container cranes require large recesses in the quay to move along their rails. At the Port of Antwerp, these gaps—up to 55 cm deep—posed a significant obstacle and a safety risk for other traffic. Discover how the STRAIL system profil safely bridges the gap, optimizes logistics, and ensures the safety of all vehicles and personnel.

Kraiburg Strail – Unternehmen SVG Icon

Our company

Kraiburg Strail – Blog SVG Icon

Blog

Kraiburg Strail – Messen & Events SVG Icon

Exhibitions & Events

Kraiburg Strail – Kontakt SVG Icon

Contact us