velovelo Preston finished level crossing

72 meters of safety: velo ensures a smooth crossing for cyclists

The deteriorated level crossing on Strand Road in Preston posed a safety risk—especially for the many cyclists. Discover how Ribble Rail used the velo system to make the crossing both safe and accessible, and how the 72-meter-long crossing was completed in just five hours thanks to the system’s rapid installation.
Find out more