STRAIL B kerbstoneQuick installation of a level crossing with B kerbstone without precast foundations and with inno

Level crossing with inno and B kerbstone installed in just three hours

The increasingly tight track possession times in modern track construction require solutions that are not only robust, but above all quick to install. For this project, the choice fell on the efficient combination of the inno system, which is independent of sleeper spacing, and the B kerbstone, which requires no foundation. It took a team of four just three hours to install the entire 5.4-meter-long level crossing. Thanks to the B kerbstone’s foundation-free design, the track could be reopened to traffic immediately after installation.